Skip to main content

What is the mowing schedule for HROA Maintenance?

Mowing of HROA common areas along the roadways, and in areas reasonably accessible with HROA equipment, under normal circumstances begins around April 1st of each year, when we are satisfied the growth-cycle has stopped or slowed.  We want to encourage native species to reproduce so the seed-head is important to see.  This allows us to stay away from thistle forming.   This is a big job and time-sensitive.   When we have a particularly wet Spring, we start mowing when the ground is dry enough to try to catch up. 

2025 Mowing Schedule 

HROA Staff Mowing Schedule
Area Status
Marina Complete
Parks  Continuous 
Gateway Drive Complete
Heritage Road Continuous 
Heritage Loop Road Continuous 
Equestrian Road Complete
693 Greenbelts  
446 Greenbelts  
475 Greenbelts  

424 Greenbelts

 
1910 In Process
Contract Mowing Schedule
Area Status
1990  
1094  
721  
452  
Fire Crews 
Area Status
693  
447  
1084  
1990  
Sheep Grazing Schedule
Area Status
1910 / G14 

Arriving in September

1990 / G14 (Herder will not bring while green)
1990 / Holly  
1094 / 20's   
693  
447  
452 / 474  
424  
475  
720 / 466